We supplied interior and exterior wayfinding signs for a multi-tenant office building in Century City, Cape Town. The brief called for clear tenant direction, durable materials and tidy installation that would work with the building traffic flow and existing finishes.

Century City Wayfinding

A practical brief for a busy Century City office building

The client needed a full wayfinding package for a multi-tenant office setting with visitors arriving from parking, reception and side entrances. The signs had to guide people quickly to lifts, tenant suites, ablutions and shared areas without making the building feel cluttered. In a place like Century City, where foot traffic changes through the day, signage must do more than look neat, it needs to help people move confidently from one point to the next.

The brief was simple on paper but quite detailed in practice. We had to match the existing corporate finishes, keep the layout consistent across floors, and make sure every sign sat at the right height and viewing angle. The building also needed outdoor directional points that could cope with wind, sun and the usual Cape Town coastal moisture. That meant choosing materials and fixing methods with long term use in mind.

  • Client type: multi-tenant office building
  • Area: Century City, Cape Town
  • Use: interior and exterior wayfinding
  • Goal: fast visitor navigation with a clean professional finish

Surveying the building and planning the sign schedule

Before fabrication, we walked the site and checked access points, wall surfaces, sightlines and existing tenant naming. That let us build a sign schedule that followed the way people actually move through the property. We mapped the reception sequence, parking entry, lift lobbies, passage junctions and door zones so the directional logic stayed consistent from outside to inside.

Because the site had multiple occupiers, there were also coordination points around naming changes and shared branding. Some areas had to remain neutral and some had to carry tenant specific text. We kept the sign family uniform so the building read as one system, while still allowing individual suites to be identified clearly. A few signs needed to be changed late in the process after the client confirmed final occupancy, which is normal on these jobs and we built that into the programme.

  • On site measurement of all main access routes
  • Sign schedule built by floor and zone
  • Tenant names confirmed before final production
  • Allowance made for final fixing points and access times

Materials and specs chosen for daily use

For the interior signs, we used rigid plastic and printed face layers where needed, paired with clean-cut lettering and directional arrows. For the exterior points, we used weather suitable substrates and corrosion conscious fixings to help the signs stand up to sunlight and sea air. In office environments, it is often the small things that matter most, like readable type size, clear contrast and enough edge clearance so the sign does not feel cramped.

The project included both wall-mounted directional signs and fitted door markers, together with larger identification panels at key decision points. We also supplied a few custom-sized pieces to fit tight wall bays where standard formats would have looked awkward. There was one section near a glazed lobby where reflections could have made the text hard to read, so we adjusted the finish and mounting position to reduce glare. That saved time for visitors and reduced confusion at a busy changeover point.

  • Interior directional signs with directional arrows and tenant naming
  • Exterior identification panels for access points
  • Cut-to-size panels for irregular wall spaces
  • Durable fixings suited to high-use office areas

Fabrication in our workshop and a tight three week programme

The work was completed over a three week programme from final sign-off to installation. Week one covered measuring, artwork setup and material preparation. Week two was used for cutting, printing, routing and finishing. Week three covered site installation, alignment checks and final touch ups. That pace suited the building schedule and kept disruption to tenants low.

Our workshop team handled the routing, panel cutting and face preparation, while the coordination side kept the sign list moving between client approval and production. The result was a neat, repeatable sign set with consistent spacing and a proper finish on each piece. In the hotter months, workshop timing matters for adhesives and handling, and on the site side we planned around the building's access windows so the install could go in without affecting normal office use. It is the kind of job where good planning saves you from rework later on.

  • Programme: 3 weeks total
  • Phase 1: survey and artwork approval
  • Phase 2: manufacture and finishing
  • Phase 3: installation and final checks

Installation done around tenants, security and access control

Installing wayfinding in an occupied office building calls for care. We worked around security procedures, cleaning schedules and tenant movement so the installation did not block corridors or reception access. Each sign was checked for level, spacing and legibility before we moved on to the next point. Where the wall finish varied slightly, we adjusted the fixings to keep every panel sitting straight.

We also checked the height of the main directional signs so they could be read from a distance without competing with doors, lifts or noticeboards. At certain intersections, a sign that is too high gets missed, while one that is too low gets hidden by people moving through the space. Getting that balance right matters in a building with visitors arriving for meetings, deliveries and daily tenant traffic. The client wanted a professional outcome and no loose ends, so we left the site tidy and the signage consistent throughout.

  • Installation coordinated around building access rules
  • Levelled and aligned all signs on site
  • Final position checks for sightlines and reading distance
  • Site left clean after handover

What the completed wayfinding system achieved

The finished signage made the building easier to navigate for first-time visitors and regular tenants alike. Reception staff had fewer repeated directions to give, and the directional flow became clearer from the parking areas through to the upper floors. For a multi-tenant office, that matters because a calm arrival experience sets the tone for the whole building.

The client also appreciated that the sign family matched across the site. The same visual language carried from the exterior points through to the interior corridors, so the building felt organised rather than patched together. If we were to do this job again, we would use the same approach: site survey first, clear sign schedule, final tenant confirmation before production and careful installation around live office hours. That formula works well for Century City and it works just as well for similar developments in Milnerton, Parklands and the wider Cape Town area.

Key facts

ProjectCentury City wayfinding signage
Client typeMulti-tenant office building
LocationCentury City, Cape Town
ScopeInterior and exterior directional and identification signs
Timeline3 weeks from approval to installation
Key outputsWall-mounted wayfinding signs, tenant IDs, door markers, exterior direction points

What our Sign and Engineering customers say

Verified Google reviews

Questions we get asked

What type of building was this project for?

A multi-tenant office building in Century City with shared entrances, reception areas, lifts and tenant suites.

How long did the project take?

The full job ran over 3 weeks from final approval through to installation and handover.

What made the project more complex than a basic sign job?

Multiple tenants, live office access, mixed interior and exterior locations, and the need for consistent wayfinding across different floors and entry points.